Saturday, October 24, 2009

October 28, FINAL BLOG POSTING FOR THE RENOVATION

More of the same on the course. We have been continuing to do all the little stuff like yardage tags on sprinklers, distance markers in the fairways, and mulch. One major effort was the installation of all the winter annual flowers.

As promised, I had the island on #7 planted with flowers to show case our initials. You can see the bougainvilla in the background really starting to bloom with vibrant color as well.
Photobucket

Here flowers are being laid out behind the green on hole #5, next to tee 6. This bed is a break from the normal uniform planting of one variety. It incorporates 6 different flowers.
Photobucket

Photobucket

Here we are laying out the beds at the driving range parking
Photobucket

Here you can see the geraniums around the new oaks at the range, looking back across the new putting green towards the Clubhoues
Photobucket

Here's #12 tee
Photobucket
Photobucket

Here's #15 tee.
Photobucket

We finally took delivery of the new granite yardage markers for the fairways the Foundation purchased for the Club. There is a red 100, a white 150, and a blue 200 on all par 4's and 5's.
Photobucket

Some other small projects being done.....

We have to now re-install all the ball washers
Photobucket

We also just received all the new hole signs that have to be installed.
Photobucket

Add a little bit of last minute tree trimming
Photobucket

Can't forget to put out the rakes in the bunkers
Photobucket

Getting all of the fountains running was difficult. After sitting all summmer, it took the better part of two days to get the fountains on 15 & 16 running. What do you call a crazy guy in a 12 john boat that leaks like a sive & uses a broken peice of a pallet as an oar?....the Superintendent!!! Sometimes you just gotta "ger r dun!"
Photobucket

A last minute addition to the project list was to redo the safety railing along hole 15.
Photobucket

Since the grow-in went so well, the Club has decided to open up the practive facilities a couple of days early. Starting on Thursday the 29th and Friday the 30th, you are welcome to come out and practice on you very own new practive facility.
She's all ready!
Photobucket
Photobucket
Photobucket

Roberto was also able to paint the bridge over Mary's Pond red, to match what it used to be.
Photobucket

I'll close me final blog with a little teaser of a pic taken on hole #4. The entire course looks beautiful. Its a new golf course with an old Florida feel. Welcome home everyone....welcome home!
Photobucket

Saturday, October 17, 2009

October 17, 2 weeks to go

It has been more fine tuning for the golf course this week. We are still working on mulching, drainage, defining fairway cuts, compacting bunkers, and all sorts of stuff.

Here the staff is running a compacting plate tamper in the bunkers. We are trying our best to compact the bunkers as much as possible to avoid the "fired egg" lie.
Photobucket

After compacting the sand, we run one of our new sand rakes through the bunker to smooth out the surface.
Photobucket

Drainage work contines. Here we are installing some extra drainage into the road side swale by #9 green.
Photobucket

Casey is checking the grade to make sure it will drain properly
Photobucket

And the proof is in the pudding....
Photobucket

We have been very busy finishing up all the little bit of sodding around drainage basins that held water, trying to get everything perfect for opening.
Photobucket

This is not one of those crazy murals you stare at until your eys go out of focus and then all of the sudden a space ship pops out from the back ground. These are all of the yardage tags for the sprinklers. We are going to mark the heads between 50 and 230-ish yards.
Photobucket

Establishing the perimeter cut of the fairways is a difficult ordeal. As you can see here, I moved the line in a little bit more to get around the drain basin a little better. We have to repaint the cut line a couple times a week, sometimes adjusting the line so we get the perfect contour, until the roughs are thick enough to have a very distinguished differential.
Photobucket

Part of the preperation process is smoothing the ground so there are no sharp creases. A great way to do this is to aerify. We have already done the greens a few week ago, and now we are doing the collars and approaches. After aerification, we will roll the areas to really "iron out" the wrinkles.
Photobucket

Here is pic of the new sign landscaping after having the area mulched, flowers go in on Mon Oct 19th. The grasses that were planted are just plug size, and need some time to mature. When they fill out to their mature size the area will be solid with native grasses.
Photobucket

Just a reminder for those of you that are in Naples, be sure to sign up for the last "offical" tour of the golf course on October 27th. Come join your friends on a guided tour and see the course, get all your questions and curiosities answered, and then stay for dinner. We look forward to seeing you and sharing your enthusiasm for the new course. It's absolutely spectacular!!!

Friday, October 9, 2009

October 9th

Ever hear the saying "the difference is in the details?" Right now, that is the mentality for the remainder of the project. The golf course is done, and 98% grown in, but there is still a tremendous amount of stuff to do. We still need to install ball washers, put back benches, spread mulch, level depressions in fairways, level sprinklers, establish fairway cuts, install some sub-surface drainage in wet spots, just to name a few "to do's."

But I have to tell ya....the course looks AWESOME! You're going to be blown away when you see it for the first time. Here's a quick update of what's going on.

As I said before, details, details, details!!! Everyday there are at least 5 guys going over every inch of the "short grass areas" checking to make sure there isn't a bad seam line or an irrigation head too low. When they find an area, they cut off the sod, regrade it, and then put the sod back.
Photobucket

Even with our new super efficient drainage system, we still have a couple of wet pockets of soil. I had the staff out putting in some sub-surface drainage lines to wick away the water to firm up the playing areas. This one is right in the landing zone on hole #1.
Photobucket

Here, one of my staff is checking the grade with a laser transit to make sure everything drains as planned.
Photobucket

All of the immature landscape areas are getting mulched
Photobucket

As well as all of the tree rings
Photobucket

Tony had a new range net installed for all you long hitters
Photobucket

Here is a pic of the Clubhouse green showing the new flag pole donated by Mr. Studley
Photobucket

A last minute addition to the project as a result of a newly identified problem is this drainage mainline install through Mr. Finigan's yard on hole #9. Now that we have an excellent drainage system to get the water off of the golf course and into the lakes, we discovered we couldn't drain the lakes on the front 9 fast enough to keep up with all of the water being added from the golf course due to a small pipe size restriction at the discharge point. The small pipe size was causing water to back up onto the golf course during periods of heavy rain. To correct the problem we installed an additional 18" drainage mainline into the system of pipes that carries the water to the lake on 13 tee where it is discharged into the Gordon River Basin. By installing this pipe, we increased the drainage flow out of the front lakes by more than 50%. A super huge, enormous, tremendous thank you goes to the Finigans and their neighbor to the north, the Metcalfs, for working with the Club to allow us to do what was needed to correct the problem. As you can see, we had to literally thread the needle with this pipe to get it into the drainage easement between the two houses.
Photobucket
Photobucket
Photobucket

As you can see, it's detail time. Marshall used to say, "It's time to put the make-up on the pig." Now, it's time to put the make-up on the beauty queen. I hope everyone is as excited as I am, can't wait to play it!!