Monday, May 11, 2009

May 12

A lot has happened since the last posting. Holes 6-18 are stripped and buried, 7-9 are completely drained, 6-9 are shaped, shaping on 10-13 will start tomorrow. 14 & 18 will start getting cut and filled (this is the process of just moving mass quantities of dirt around with out shaping it).

Here's a progressionary clip set of the new rock walls on 16
Photobucket
Photobucket
Photobucket
Photobucket
Photobucket
Photobucket

Here is some pics of the shaping work taking place on the new tees on 6.
Photobucket

The shaper is working on the front left corner of the 6 white tee. The new littoral planting around the left side of the teeing ground will give you and feeling of being high off the ground.
Photobucket

This pic shows how far the golf course was on Mooring Park's land. The stakes on the left are the property boundry, and you can see the heads taken off on the right. The chain link fence will be removed and the fence line will be re-established on the property line with some of their new extruded aluminum fence. It will look first class!
Photobucket

I had to post this pic.....sometimes the ground isn't has hard as you think, even for a bull dozer. This machine is stuck in 5 foot of mud, then just sank. Its not just a simple thing of pulling it out as the muck creates a suction around the machine. You have to dig it out to break the suction, then pull it out with something even bigger!
Photobucket

Here the crew is hard at work clearing off the strippings to the bury pits.
Photobucket

Look at all of the machines in this pic. This is why the contractor is moving so fast on stripping the ground.
Photobucket

My biggest challenge right now is staying ahead of the stripping crew. This pic is of my crew digging up wires and burying them deeper because of the new contours of the course. What used to be deep enough, sometimes isn't any more.
Photobucket

The "Elephant Burial Graveyard" is officially cleared out. It took some serious muscle to get all of the "stuff" shred up. This machine isn't for digging, it has a special pair of cutters on the end so it can slice right through 24" logs no problem.
Photobucket
Photobucket

After the "Slicer" cuts the big stuff into managable pieces, the loader with a claw rake grabs the stuff and puts into the shredder.
Photobucket

And out the business side comes what's left....
Photobucket

Here's the whole production
Photobucket

As we get closer to grassing you will see the water being run on the course. We have to try and turn the dessert back into a place where grass will grow. It takes a lot of water to "wet" the soil once it dries out completely.
Photobucket

That's it for now. Stay tuned for more updates to come.

Tuesday, May 5, 2009

Cinco de Mayo

Dirt, dirt, and more dirt. One thing that I have learned, is that when you think you're done pushing dirt during construction, go get a shovel....its time to move it again. It seems there is no end to the procession of scrape, load and haul these days. Actually that's great news as the contractor is moving fast in stripping. At the end of today 6, 7, 8, 9, 10, 11, 12, 13, 14, & 18 are completely stripped. By end of tomorrow 7, 8, & 9 will be completely done with drainage installs. Half of 10 & 13's drainage is done also. Although we were planning on grassing 6 holes about this time in the planning stages, it really is going to be towards the end of the month and we will be grassing at least 8 holes, and maybe a couple more might be done by the time the grassing guys get done with the first 8.

Here is the dozer pushing up the piles on 14
Photobucket

Here is the procession of haulers. You can see why they have air conditioned cabs. These guys are hauling from 14 fairway to 18 fairway bury pit.
Photobucket

Here's 18's bury pit. They back the loaded trucks over the freshly pushed in materials to compact it so hopefully there is little to no settling.
Photobucket

Hey look, its a new water hazard on 17 fairway. This pit will be large enough to contain the strippings from 15, 16, & 17 when it is finished be excavated
Photobucket

On the front side the shapper is finishing all the little touches to the course. Here is the new blue tee on #7 flatten out.
Photobucket


Part of the project is to enlarge the tees on 16. Here the contractor is selecting the "good" rocks to use in the construction of the walls.
Photobucket

Then the rocks get loaded into the trucks and delivered to the work site
Photobucket

Then...its not a slow boat to China, its a slow - enormously large earth mover crawl to China
Photobucket

Then its time to start "Rock'n Out" We actually had a rock so big that this big moster machine couldn't lift it into a truck, so we just pushed into a 10' deep hole and buried it deep.
Photobucket

Wanna know what some of my days look like...sometimes I'm the guy running the machines - and its actually fun!
Photobucket

Here the contractor is teaching his crew the proper way of setting the catch basins to grade. Notice the level, these guys are very thorough.
Photobucket

This has nothing to do with the project, I just wanted Tony & Shawn to be jealous of the big fish I caught! Its a 34" snook caught in Estero Bay two weeks ago.
Photobucket

Stay tuned....more to come. PS>>>the time stamps on these posting is west coast time....its actually 10 pm here.

Friday, May 1, 2009

May 1

I have to say, things are going very well. We are "Rocking" & rolling along. This week it finally hit me. During the planning phase of this process, everyone keep telling me that there is too much rock here, and the going will be tough. That's true if you try to run a trencher through the ground. However, if you use an excavting machine like this one you'll hit some rock, but be able to dig it out. Here, we were only bury irrigation control wires. We weren't putting any pipe in the ground.
Photobucket

Here is an picture of the start of a new bury pit on 18 fairway
Photobucket

And a day later you have this......
Photobucket

As I was driving around the other day I saw this white stuff on the ground, its salt from the irrigation water that has moved to the surface through capilary action. Its just like the grade school science experiment where you disolve the table salt in a glass of water and then let the water evaporate. Well, when we let the ground completely dry, like it is now, it leaves us with all of the salt left over from the effluent water.
Photobucket

As part of the project, a new discharge pump was installed to drain the North side of the property. Here is the 26 yr old pump on its way to the fabrication shop.
removing old discharge pump

Here is the new one, installed. You can see how I had the discharge pipe angled down and buried so I can landscape around the pump shelter.
Photobucket

We finally got all of the breaks repaired and were able to do some dust control. I'm very sorry for those home owners on 10 & 11, thank you for your understanding.
Photobucket

At the end of on month the contractor has stripped 7, 8,9, 10, 11, 12, 13, 18, and started 14. Drainage is complete on 7, most of 8, half of 10, and half of 13. 7 fairway is graded and shaped, 8 & 9 fairways are filled and waiting to be graded. All of the bury pits are filled on 11 & 12. Next on 10, 11, 12 will be filling and shaping.

Tuesday, April 28, 2009

April 28th

Well, since the last posting our golf course now looks like an earth mover show room. Currently we have 3 loaders, 3 large excavators, 2 mini excavators, 4 off road dump trucks, a bobcat, a back-hoe, & 2 dozers. To keep all of the machines running, the contractor is using 400-500 gallons of diesel a day.

How's this for a "Tonka Truck?" Bet your grand kids would like to play around with this one!
Photobucket

Here are two of the smaller trucks waiting to be loaded with clean material to haul from #11 to #9
Photobucket

I took this pic of a bury pit on #12 so you can see how far down the excavator is reaching. The arm of this machine will dig almost 25 feet down and you can see he has it about half way down.
Photobucket

Another angle of the same hole. This entire hole was filled in 1 day with strippings
Photobucket

Here's a pic from the new back tee on #9. Don't worry, I'll move the tree.
Photobucket

The contractor is moving fast on the drainage. Here is a pic of some newly installed bunker drainage.
Photobucket

Part of the whole project is making an "as built" map of where things are. Here is one of the contractor's crew marking drain lines with a GPS unit called a "Trimble." It will be accurate within two feet so we will have a very precise record of where things are.
Photobucket

He also marks where the new drainage basin are being installed.
Photobucket

Here's an example of one of the big challenges with installing the new drainage system. The contractor has to negotiate all of the existing irrigation system stuff. Well, at least he's trying to.
Photobucket

Another challenge is to lower pipes that are now close to the surface once the dozers shape the new contours. Here we are lowering this pipe 10" so that when we aerify, we don't poke it full of holes.
Photobucket

Check this out! Now that's what I call a stump.....
Photobucket

More to come later in the week. Thanks for checking it out.

Tuesday, April 21, 2009

April 21

Now things are really taking shape; 7, 8 , & 9 are stripped and buried. The contractor is starting to strip the grass off on #11.
Photobucket

Here the contractor is stripping the boundary with the specialty machine to make sure the spoils do not wind up in the neighbor's yard.
Photobucket

Here is a good example of how field changes happen, especially in a renovation. The plans called for a bunker right over top of a 6" mainline (which the contractor nicked with the dozer track & had to be replaced). So we shifted the bunker over 5 yards to the left.
Photobucket

Here is an example of where we moved the irrigation lines instead of the bunkers. The old irrigation lines for 9 green went right through the middle of the new bunkers, see the old bent pipe next to the new bright white pipe(I'm taking the pic from the back of the green's slope). Making a field change here would have too much negative impact on the layout. That's when you change the infrastructure instead of the design.
Photobucket

During the process, its a constant "tweaking" of the design. Myself and the contractor probably don't go more than an hour without talking about what has happened so far that day, what's coming, or the new fire that just popped up. Here we are discussing the 1st bunkers made on 7. I had asked for some changes to the contractor's interpretation of the design. This is the natural process, the shapers have to get a feel for the design's intended shape and look. Remember, they are going from looking at a 2 dimension, flat drawing and now trying to build it 3-D. After 1 or 2 bunkers, very little changes have to be made.
Photobucket

Photobucket

A new world has been discovered at CCN!!! Here the contractor is clearing the old dump for the new blue tee on 13. HOLY HUGE BRAZILIAN PEPPERS BATMAN!!
Photobucket

Here's a look from 13 fairway
Photobucket

Here is a look from the new tee location
Photobucket